Reference Projects (Excerpt)

New Waste with lying Incineration Plant for Biomass 2015-2017 20‘000 to / 1

New Windpower and PV Technology 2014-2021

SOAKRO Feasibility study of Energy- and Environmental - Technology 2014 1 area; 1 Biogas-plant 500 KW; cooling-slurry for food-2014

TESS energia 48 Wind Power Plants à 2-3 MW,

DEA Crotone 198 Wind Power Plants à 2-3 MW; into 18 area in Italy; 1Biodiesel-power-plant 100MW;Biogas 10 MW for biowast; 1 Seabiotec-Seafood aria; Chiller Axair (Carrier) 10 MW power; 2009.

Biogas plants for dry and / or wet fermentation for the fermentation of biomass from organic waste, renewable resources and bio waste, 250kW;500kW, 1 MW-3 MW electric power 2012.

Biodiesel Dessau GmbH Canola Esterification Plant (Biodiesel) in Germany
Project development, -guidance, technical management, management of plant operations. Building sum / contruction prce approx. 20 Mio. Euro. Plant Capacity 100.000 Tons canola p.a.

Wind Power Plants
in Italy Project Development 2004 until 2005. Realisation 2006-2008, Range: 48 wind turbines ENERKON a 2 MW (E82), 98 m hub height, production 262 GW pa.

Waste Incineration Plant in Italy
Grate Stoker Furnace 2 lines. Prelimiary study and planning 2004 of a Waste Incineration Plant for approx. 100.000 metric tons p. a. household waste and high temperature gasification.

Gas turbine Plant ENRON USA Builder:AMPS Stuart/ Texas USA (ENRON subsidiary)
Planing and construction of a Waste Gas Purification Plant for a mobile 25 MW Gas Turbine Plant with a natural gas or diesel fuel powered unit. Costs approx. 25 Mio. US$, Patent «Hartenstein – SCR mit Harnstoff construction time only 12 Months. 2000 until 2001.

Gas Purification of 8 Glas Production Plants for Samsung / Corning, Korea
Exhaust gas volume from 15.000 Nm 3/h to 350.000 Nm 3/h, nitrogen removal, desulfurization, desusting / dust removal. Building Sums of 0,5 Mio. DM to 30 Mio. Euro Construction time from 1997 until 2002

Gas Purification of Boiler Plant Toni-Molkerei Zurich
Waste Gas Purification, nitrogen removal, 2 x 15 MW Heavy Oil Boiler Plant, Planning and Delivery, CHF 2 Mio, 1999

Gas Purification of Boiler Plant , Chemical Factory in Raschig / Mannheim, Germany
Waste Gas Purification and nitorgen removal of the 80 MW Heavy oil boiler plants, plannning and delivery, 1998